Project: Concrete and Asphalt Paving for the NEO Tobago Onshore Gas Facility
Cove, Tobago, Trinidad and Tobago
Description:
Phase 1 and 2 of concrete paving included upgrade to a compacted gravel surface of 9500 m2 for plant and 2500 m2 for fibre reinforced concrete and paving of the surface under main racks and around process equipment. Subsequent work involved upgrade to the fibre reinforced concrete surface of 9500 m2 of plant and construction of 30 m of double reinforced concrete roadway to condensate loading bay.
Asphalt Paving: Construction of 3300 m2 (550 m) of asphalt roadway. Excavation to 550mm depth and placement of compacted rotten rock, geogrid and crush run.
Services Provided:
- Developed Concrete Paving Drawings and Specifications
- Developed Scope of Work and FIDIC Contract Document
- Provide Construction Inspection, Quality Control and Assurance
- Construction Management
- Manage Contract and closeout
Type
Civil Engineering
Client
National Gas Company of Trinidad and Tobago
Date
8 February, 2019